The project involves the construction of two road underpasses located on either side of the Trikala Railway Station, as well as the construction of one automatic level crossing (ASID).
Specifically, it involves the construction of the underpass for pedestrians and small vehicles at the location “Saragia” of the Municipality, the underpass for pedestrians at the location “Gazelo” of Trikkeoi Municipality and the ASID at Km 73+098 of this line.
The project aims at eliminating the existing level crossings and replacing them with grade separate crossings, to ensure the uninterrupted and safe traffic of pedestrians and vehicles on either side of the railway line. Once the ASID is constructed, both the train and road traffic will be carried out in a safe way.
Project Summary
Project Stage: Completed
Funding:
Operational Program (OP) Railways, Airports and Urban Transport (RAUT) 2000-2006
Regional Operational Program (ROP) Thessaly 2007-2013
Project Cost: 2.5 mil. Euros
Milestones:
Construction start: 2013
Project completion: 2016